Yahoo India Web Search

Search results

  1. Aug 18, 2024 · Bangalore Metro Rail Corporation Limited (BMRCL) on Saturday morning started trial runs (train testing) on Bangalore Metro Green Line’s 3.031 km Reach 3C connecting Nagasandra – Madavara. Reach 3C is the smallest elevated extension of the 73.92 km Bangalore Metro Phase 2 project.

  2. Aug 21, 2024 · Trial runs for the Green Line extension of the Bengaluru Metro have officially commenced. On August 18 morning, signal testing began along the 3.14-kilometre stretch between Nagasandra and Madavara.

  3. The extended Green Line of Namma Metro, from Nagasandra to Madavara, will begin operations by October following trial runs and safety clearances.

  4. Aug 18, 2024 · The Bangalore Metro Rail Corporation Limited (BMRCL) Saturday started trial runs on the Green Line’s 3.1-kilometre-long Reach 3C connecting Nagasandra to Madavara. Once this section becomes operational, the Green Line length will increase to 34.46 km and the overall Metro length in Bengaluru will rise to 75.2 km.

    • 153
  5. Sep 19, 2024 · The Bengaluru Metro's Green Line extension from Nagasandra to Madavara is set to begin operations next month, easing traffic on Tumkur Road. The 3.7-kilometre stretch, built for ₹298 crore, has completed trials, and awaits safety certification for public use following inspection.

  6. Bengaluru Metro has launched trial runs for the 3.14 km Green Line extension between Nagasandra and Madavara. Initial tests began on August 20, with trains operating at speeds of 3-35 km/h. Commercial operations are expected by the end of October, with potential public access by mid-September.

  7. People also ask

  8. Aug 31, 2024 · Bengaluru's Namma Metro has commenced trial runs on the Green Line extension from Nagasandra to Madavara, with full passenger service expected by late September or early October. The 3.7 km extension cost Rs 298 crore and includes stations at Manjunath Nagar, Chikkabidarakallu (formerly Jindal Nagar), and Madavara (BIEC).