  1. BESCOM | SRTPV Online Application. Government of Karnataka has notified Karnataka Renewable Energy Policy 2022-27 on 30.04.2022. In order to tap the existing solar energy opportunities & other sources of Renewable generation in the State, Policy allows Grid connected Rooftop solar PV projects under Net Metering and Gross Metering arrangement.

    • Officers' Login

      SRTPV ONLINE SERVICES. Apply Online (current) Apply Online...

    • Srtpv Janardan

      The Seller intends to connect and operate the Solar Roof Top...

  2. For 1kW to 10kWP SRTPV plants ( Residential consumers) : The consumer shall execute PPA through e-Sign at the time of submission of Application, however the details of Distribution transformer and feeder shall be updated in the SRTPV online portal by the BESCOM field officers at time of commissioning. 9.

  3. of fee in online mode either through net-banking, debit / credit card, UPI etc 9. After successful payment the consumer is directed to application page, where the consumer can view the Application details & Payment Details.

  4. 7.1 The Seller, shall arrange to shift the existing meter to the generation side of SRTPV plant to measure solar power generation and install Bi-directional meter (whole current/CT operated) at the point of interconnection to the distribution system, at a suitable place in the premises, accessible for recording export of energy, from the SRTPV system to the grid and import of energy to the premises of the consumer from the grid.

  5. 26. Before Commissioning of the SRTPV plant verify the Panel, grid tied inverter, bi-directional meters details & wiring, safety aspects as per the norms. In case of any observations the same shall be recorded in the remarks column and return the work completion

  6. Consumer has to pay 100% SRTPV installation amount to vendors. Subsidy amount will be paid to consumer by MNRE Empanelment of Vendors - Through Tender Empanelment of Vendors - Direct as per Simplification of Procedure Apply online HESCOM portal link https://srtpv.hescom.co.in/SRTPV/ Apply online National portal link www.solarrooftop.gov.in

  7. People also ask

  8. 1. Procedure and Time Lines for Grid connected SRTPV plants A. For SRTPV plants ranging 1kW to 10kW domestic consumers Step Procedure Responsibility Time lines Step - 1 The Applicant shall submit On-line Application Only in the SRTPV portal. The Registration process is complete with below of 3 steps: 1. Entering Rooftop details such as Solar