Search results
People also ask
What is Pune Metro?
What is Pune Metro Phase 2 project?
Why should you choose Pune Metro?
When will Pune Metro Phase 1 open?
Pune Metro is a mass rapid transit system serving the city of Pune, India. The system comprises 3 lines with a combined length of 54.14 km (33.64 mi), [7][8] of which 24.12 km (14.99 mi) on two lines are operational as of August 2024. [9] .
- Information
- System Specifications
- Key Figures
- Pune Metro Under Construction Lines
- Pune Metro Proposed Lines
- Pune Metro Route Map
- Pune Metro Tenders
- Pune Metro History
Pune Metro is an urban Mass Rapid Transit System (MRTS) with 3 lines under construction in the city of Pune, Maharashtra by Maharashtra Metro Rail Corporation Limited (Maha-Metro) and Pune Metropolitan Region Development Authority (PMRDA). 31.254 km Pune Metro Phase 1 project’s Detailed Project Report(DPR) with 2 metro lines and 29 stations was pre...
Top Speed: 80 kmphAverage Speed: 34 kmphTrack Gauge: Standard Gauge – 1435 mmElectrification: 25 kV, 50 Hz AC OHEOperational: 29.77 km | Under Construction: 31 km | Approved: 0 km | Proposed: 106.5 km 1. Daily Ridership: 70,000 / day (August 2023) 2. Rolling Stock: 104 coaches (26 train-sets x 4) to be supplied by Titagarh-Firema for Phase 1
Line-1 (Purple Line):Pimpri Chinchwad Municipal Corporation (PCMC) – Swargate 1. Length: 16.589 km 2. Type: Elevated & Underground 3. Elevated: PCMC – Range Hills Ramp: 11.570 km, 9 stations 4. Underground: Range Hills Ramp – Swargate: 5.019 km, 6 stations 5. Depot: Range Hills (13.27 hectares) 6. Number of Stations: 14 7. Station Names: PCMC, Tuka...
Line-1 Extension (Purple Line): Swargate – Katraj 1. Length: 5.464 km 2. Stations: 3 3. Estimated Cost: Rs 4283.72 crore 4. See in-depth information within Phase 1 Extension’s page Line-2 Extension (Aqua Line): Vanaz – Chandni Chowk 1. Length: 1.5 km 2. Stations: 2 3. See in-depth information within Phase 2’s page Line-2 Extension (Aqua Line): Ramw...
The embedded map below shows the location of all stations for Phase 1 (exact) and Line-3 (tentative), and can be zoomed into! An official PDF route map of Pune Metro will be added here when available.
Latest Pune Metro (Maha-Metro) tender notices can be viewed on Maha-Metro’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & constructionpage. A list of Phase 1’s contractors can be viewed here and Line-3’s contractors can be viewed here.
Phase 1 • 6 March 2022: PCMC – Phugewadi (Purple Line) – 6 km • 6 March 2022: Vanaz – Garware College (Aqua Line) – 4.35 km • 1 August 2023: Phugewadi – Civil Court (Purple Line) – 8.03 km • 1 August 2023: Garware College – Ruby Clinic Hall (Aqua Line) – 5.45 km • 6 March 2024: Ruby Clinic Hall – Ramwadi (Aqua Line) – 5.94 km Menu: News & Construct...
About Pune Metro. Pune, the cultural and historical capital of the state of Maharashtra, known as the ‘Queen of Deccan’ due to its scenic beauty and rich natural resources.
5 hours ago · PM Modi will also lay the foundation stone for 5.46 km long Swargate-Katraj Extension of Pune Metro Phase-1 to be developed at the cost of around Rs 2,955 crore. Further, PM Modi will launch Rs ...
Brief Background. Pune Metro Phase I will cover an aggregate length of 31.254 Km. Corridor 1- PCMC to Swargate, a length of 16.589 Km with 5 Km underground and 11.5 Km elevated, comprising15 stations (9 Elevated and 6 Underground).
The entire Pune Metro Phase 1 is expected to be completed and opened in January 2025, much later than its December 2021 deadline. System Specifications. Top Speed: 80 kmph. Average Speed: 34 kmph. Track Gauge: Standard Gauge – 1435 mm. Electrification: 25 kV, 50 Hz AC OHE. Signalling: Communications-based Train Control (CBTC) Key Figures.