Yahoo India Web Search

Search results

  1. Operated by Chennai Metro Rail Limited (CMRL) – a joint venture between the Government of India and the State Government of Tamil Nadu, the network consists of two lines and spans 54.1 km (33.6 mi). The system uses standard gauge and has 41 underground and elevated stations.

  2. Chennai Metro Lines. Currently Chennai Metro has 5 lines (2 Operational, 3 Planned) which have daily ridership 102,000 passengers. The system length of complete Metro in Chennai is around 171 k.m in which 45.1 km is operational, 9.1 km is Under construction and 118.9 km Phase lI is Tendering. Chennai Metro Lines List.

  3. Key Figures. Operational: 54.15 km | Under Construction: 102.97 km | Approved: 15.93 km | Proposed: 15.3 km. Daily Ridership: 2.66 lakh/day (July 2023) Rolling Stock: 208 coaches (52 train-sets x 4) supplied by Alstom. Operational Lines (Phase 1, Phase 1 Extension) Line-1 – Blue Line: Chennai Airport – Wimco Nagar (32.15 km, 25 stations)

  4. Jul 23, 2024 · The Phase I of Chennai Metro Rail project covers a length of 45.046 km network and consists of two Corridors i.e. Corridor-I From Washermenpet to Airport (23.085 Km), Corridor -2 From Chennai Central to St. Thomas Mount (21.961 km). About 55% of the Corridors in Phase I is Underground and the remaining are Elevated.

  5. The Chennai Metro is a rapid transit system serving the city of Chennai, India. The system consists of two lines and 32 stations, and it began operation in June 2015. Operating hours from Monday to Saturday are 05:54 - 22:00 and Sundays 07:54 - 22:00.

  6. Exclusive Metro Connect The Government of Tamil Nadu created a Special Purpose Vehicle (SPV) for implementing the Chennai Metro Rail Project. This SPV named as “Chennai Metro Rail Limited” was incorporated on 03.12.2007 under the Companies Act.

  7. Jul 15, 2022 · Chennai Metro has two operational metro lines, which are the blue line and green line. Chennai Metro also has three under construction lines. Chennai Metro Operational Lines (Phase 1, Phase 1 Extension) Line-1 – Blue Line: Chennai Airport Metro Station – Wimco Nagar Metro Station (32.15 km, 25 stations)