Yahoo India Web Search

Search results

  1. Nagpur Metro Rail Project consists of 38.22 Km metro corridor, 38 stations and 2 Depots. The entire stretch has been divided into 2 alignments or corridors as follows: Alignment

    • Information
    • Nagpur Metro Phase 2 Routes
    • Nagpur Metro Phase 2 Route Map
    • Tender Status & Contractors

    43.8 km Nagpur Metro Phase 2 project’s Detailed Project Report (DPR) was prepared by RITES and approved by the Maharashtra state government’s cabinet in January 2019 with an estimated cost of Rs. 5,976 crore. In April 2023, Maharashtra government’s cabinet approved the project with a revised estimated cost of 6708 crore. The DPR’s approval has sinc...

    Line-1 (Orange Line) Reach 1A: Khapri to Butibori MIDC ESR 1. Length: 18.7 km 2. Number of Stations: 10 3. Station Names: Eco Park, Metro City, Ashokvan, Dongargaon, Mohgaon, Meghdoot CIDCO, Butibori Police Station, Mhada Colony, MIDC KEC and MIDC-ESR Line-1 (Orange Line) – Reach 2A & Reach 2B: Automotive Square to Kanhan 1. Length: 13 km 2. Number...

    Key: Line-1 – Orange Line | Line-2 – Aqua Line An official PDF route map of Nagpur Metro Phase 2 will be added here when available.

    Click on ‘News & Construction Updates’ below for project news, progress and updates. Menu: News & Construction Updates | Phase 1 Info | Phase 2 Info | Broad Gauge Metro Project Page last updated: September 3, 2024. Have a question or spot an error? Let me know here.

  2. Nagpur Metro Rail Project will consist of 38.215 Km metro corridor, 38 stations and 2 Depots. The entire stretch will be divided into 2 alignments or corridors as follows: Alignment

  3. en.wikipedia.org › wiki › Nagpur_MetroNagpur Metro - Wikipedia

    The project consisted of two routes: Automotive square, Kamptee to MIHAN Metro depot and Prajapati Nagar, East Wardhaman Nagar to Lokmanya Nagar, Hingna. There would be 17 stations on Route no. 1 with a terminal cum depot at MIHAN and 19 stations on Route no. 2 with a terminal cum depot at Lokmanya Nagar.

  4. Nagpur Broad Gauge Metro project with a network of 4 suburban rail lines is a 268.63 km regional rapid transit system (RRTS) that proposes to utilize the Central Railways’ existing tracks to connect Nagpur with nearby towns of Wardha, Katol, Narkhed, Ramtek and Bhandara via a modern comfortable railway system.

  5. Construction work on Nagpur Metro’s 38.215 km Phase 1 started in 2015 with a mix of elevated & at-grade (ground level) lines. Commercial operations on its first section (Khapri – Sitabuldi) was inaugurated by Prime Minister Narendra on March 8, 2019. The entire Phase 1 project was inaugurated on December 11, 2022.