Yahoo India Web Search

Search results

    • 1.312 km

      • According to the DPR, The total length of the project will be 1.312 km all elevated, with 1 elevated station at Ajmer Road and a 0.357 km loop line.
      en.wikipedia.org/wiki/Jaipur_Metro
  1. People also ask

  2. en.wikipedia.org › wiki › Jaipur_MetroJaipur Metro - Wikipedia

    The Jaipur Metro is a rapid transit system in the city of Jaipur, Rajasthan, India. [6] Construction on the mostly elevated part of the first line, called Phase 1A, comprising 9.63 kilometres (5.984 mi) of route from Mansarovar to Chandpole Bazaar, [1] started in November 2010, [7] and was completed in 2014.

  3. Length: 9.63 km (Phase 1A) and 2.35 km (Phase 1B) Type: Elevated & Underground. Depot: Mansarovar. Number of Stations: 11. Stations Names: Mansarovar, New Aatish Market, Vivek Vihar, Shyam Nagar, Ram Nagar, Civil Lines, Railway Station, Sindhi Camp and Chandpole, Chhoti Chaupar, and Badi Chaupar.

  4. Jul 10, 2024 · Phase 1-B is 2.34 kilometres long and has 2 stations, finished on September 23, 2020. Phase 2 will be longer, about 23.099 kilometres, and have 20 stations. They plan to finish phase 2 by 2024. When all phases 1 and 2 are done, the jaipur metro will cover 35.078 kilometres and have 31 stations.

    • Suju
    • Jaipur Metro
    • Details
    • Jaipur Metro Rail Corporation (JMRC)
  5. The Jaipur Metro Rail system is India's sixth metro rail system after those in Kolkata, Delhi NCR, Bangalore, Gurgaon and Mumbai. It is also touted as one of the fastest built metro systems in India.Jaipur Metro is the first metro in India to run on Double-storey elevated road and Metro track. 24X7 Helpline/Toll Free No. 1800-202-4116.

  6. Jaipur Metro. Pink Line Jaipur Metro (JMRC) Active. Pink Line Jaipur Metro is a line of Jaipur Metro which run between Mansarovar and Badi Chopar. It was opened on 3 June 2015 and have 11 metro stations.The length Pink Line Jaipur Metro is around 12.067 km (7.498 mi) and have operating speed of 50 km/hr. Orange Line Jaipur Metro (JMRC) Proposed.

    Source
    Destination
    Fare
    Distance
    Jaipur Railway Station
    Mansarovar
    Rs. 17
    6.82
    Sindhi Camp
    New Aatish Market
    Rs. 17
    6.62
    Sindhi Camp
    Mansarovar
    Rs. 17
    8.07
    Vivek Vihar
    Chandpole
    Rs. 17
    6.30
  7. The metro starts at around 06:30 in the morning and runs until around 22:00 at night, all seven days of the week. However, the speed of the trains varies according to the route and the timetable. In general, there is a 15-minute interval between trains.

  8. Jun 3, 2015 · The length of the metro rail track to be built between Badi Chaupar and Transport Nagar will be 2.85 kilometers.