  2. Tarapur Atomic Power Station was constructed initially with two boiling water reactor (BWR) units under the 1963 123 Agreement between India, the United States, and the International Atomic Energy Agency (IAEA).

    • Tarapur Atomic Power Station Background
    • Safety Upgrades For Tarapur Units One and Two
    • Taps Units Three and Four Details
    • Contractors Involved

    Construction of the Tarapur nuclear power station was started in October 1964, following the signing of a contract between the governments of India and US in May 1964 to collaborate for building India’s first ever nuclear power plant along the west coast of India. The construction phase involved 120 Americans, while GE supplied both the BWR units o...

    Although the initial rated power of both TAPS 1 and 2 was 210MW, it was reduced to 160MW after the secondary steam generators were isolated in 1984 due to frequently reported tube leakages. Further, a number of modifications were carried out between 2005 and 2006 based on the AERB’s comprehensive safety assessment for the continued long-term operat...

    Designed and developed by NPCIL, the third and fourth reactor units at Tarapur atomic power station are the first PHWR units to be used in India. Each horizontal pressure tube reactor unit, with physically separated independent safety and shutdown systems, has a design net capacity of 540MW. Construction of the TAPS units three and four was started...

    GE was the turnkey engineering, procurement, and construction (EPC) contractor for the TAPS units one and two. Larsen & Toubro (L&T) was engaged for the main plant civil works, service water system, primary steam piping, composite chilled water, and heating, ventilation and air-conditioning (HVAC) packages, as well as electrical and instrumentation...

  3. S.No. Plant Unit Type Capacity (MWe) Date of Commercial Operation; 01: Tarapur Atomic Power Station (TAPS), Maharashtra: 1: BWR: 160: October 28, 1969: 02: Tarapur Atomic Power Station (TAPS), Maharashtra

  4. en.wikipedia.org › wiki › IPHWR-700IPHWR-700 - Wikipedia

    Two of these were constructed at the Tarapur Atomic Power Station. After a redesign to utilise excess thermal margins, the 540 MW PHWR design achieved a 700 MW capacity without many design changes. Almost 100% of the parts of these indigenously designed reactors are manufactured by Indian industry.

  5. Tarapur Atomic Power Station was constructed initially with two boiling water reactor (BWR) units under the 1963 123 Agreement between India, the United States, and the International Atomic Energy Agency (IAEA). It was built for the Department of Atomic Energy by GE and Bechtel.

  6. Jan 18, 2024 · On December 17, 2023, India’s largest indigenously developed 700-MWe pressurised heavy water reactor (PHWR) – the fourth unit in Kakrapar, Gujarat – attained criticality. Six months earlier,...

  7. Tarapur Maharashtra Site. Tarapur Maharashtra Site is located on the west coast of the Arabien Sea at Tarapur, District Thane in the state of Maharashtra. It consists of two stations: Tarapur Atomic Power Station 1 & 2 (BWR) Tarapur Atomic Power Station 3 & 4 (2 X 540 MWe PHWR)