Yahoo India Web Search

Search results

  1. Our objective is to make Kochi the first city in the country where the entire public transport system: the metro, the buses, the boats, the auto-rickshaws and the taxies work together as a seamless integrated system; with a common timetable, common ticketing and centralised ‘command and control’.

    • Tenders

      Geo technical investigation works for Phase 2 Kochi metro...

    • Travel Information

      Metro Station Controller’s Contact Details. STATION NAMES:...

    • The Project

      Kochi Metro has also planned a Public Bike Sharing (PBS)...

    • Kochi1 Card

      Kochi Metro has also brought back the Kochi1 card offers....

    • About Us

      The Kochi Metro Rail Project is the first move in such a...

    • CMP Thiruvananthapuram

      Click here to download CMP Report – Thiruvananthapuram Note:...

    • Bliss City

      Kochi Metro Rail Ltd (KMRL), a joint venture company with...

    • Business Opportunities

      JLN Metro Station, 4th Floor Kaloor, Ernakulam - 682017...

  2. en.wikipedia.org › wiki › Kochi_MetroKochi Metro - Wikipedia

    The Kochi Metro is a rapid transit system serving the city of Kochi and the wider Kochi Metropolitan Region in Kerala, India. It was opened to the public within four years of starting construction, making it one of the fastest completed metro projects in India.

  3. ALUVA-TPHT. Peak Hour-Morning. 07 min 15 sec. Peak Hour-Evening. 07 min 15 sec. Non-Peak Hour. 08 minutes. First passenger service time from ALVA: 06:00 Hrs. Last passenger service time from ALVA: 22:30 hrs.

    • Information
    • System Specifications
    • Key Figures
    • Kochi Metro Operational Line
    • Kochi Metro Under Construction Line
    • Kochi Metro Approved Lines
    • Kochi Metro Route Map
    • Kochi Metro Fare Chart
    • Kochi Metro Tenders
    • Kochi Metro History: Key Dates
    • GeneratedCaptionsTabForHeroSec

    Kochi Metro with 1 elevated line and 21 stations is an urban Mass Rapid Transit System (MRTS) built to serve Kochi, the commercial capital of Kerala. Construction for the 25.16 km Kochi Metro Phase 1 project connecting Aluva to Petta with 22 stations started in June 2013. India’s Prime Minister inauguratedthe line’s first 13.2 km section between Al...

    Top Speed: 80 kmph
    Average Speed: 34 kmph
    Track Gauge: Standard Gauge – 1435 mm
    Electrification: 750 V DC Third Rail

    Operational: 26.8 km (Phase 1 & 1A)| Under Construction: 1.16km (Phase 1B) | Approved: 11.2 km (Phase 2) 1. Daily Ridership: 82,000/day (July 2023) 2. Rolling Stock: 75 coaches (25 train-sets x 3) supplied by Alstom

    Line-1 (Blue Line): Aluva – S.N. Junction 1. Length: 26.8 km 2. Type: Elevated 3. Depot: Muttom (23.6 hectares) 4. Number of Stations: 24 5. Station Names: Aluva, Pulinchodu, Companypady, Ambattukavu, Muttom, Kalamassery, Cochin University (CUSAT), Pathadipalam, Edapally, Changampuzha Park, Palarivatom, JLN Stadium, Kaloor, Lissie, M.G. Road, Mahar...

    Line-1 (Blue Line): S.N. Junction – Tripunithura 1. Length: 1.163 KM 2. Type: Elevated 3. Number of Stations: 1 4. Stations Names: Tripunithura 5. Status: Trial Runs Started in December 2023

    Line-2 (Pink Line): JLN Stadium – Infopark II 1. Length: 11.2 km 2. Type: Elevated 3. Number of Stations: 11 4. Station Names: Jawaharlal Nehru Stadium (new station box), Palarivattom Junction, Palarivattom Bypass, Chembumukku, Vazhakkala, Padamughal (formerly Kunnumpuram), Kakkanad Junction, Cochin SEZ (Special Economic Zone), Chittethukara, KINFR...

    The embedded map below shows the exact location of all stations and can be zoomed into! An official PDF route map of Kochi Metro will be added here when available.

    Kochi Metro Rail Ltd. fixed Line-1’s fares in November 2016 with a minimum fare of Rs. 10 and maximum of Rs 60. Fare increases by Rs. 10 for every additional zone traveled. After issue, a single ticket is valid up to 90 minutes and the rider must exit at the destination station’s automatic fare collection (AFC) gate by then.

    Latest Kochi Metro (KMRL) tender notices can be viewed on the KMRL’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & constructionpage.

    19 June 2017: Aluva – Palarivattom (Line-1/Blue Line) – 13.2 km
    4 October 2017 – Palarivattom – Maharaja’s College (Line-1/Blue Line) – 5 km
    3 September 2019 – Maharaja’s College – Thaikoodam (Line-1/Blue Line) – 5.65 km
    7 September 2020 – Thaikoodam – Petta (Line-1/Blue Line) – 1.12 km

    Kochi Metro is an urban Mass Rapid Transit System with 21 stations on Line-1 and 11 stations on Line-2. Find out the latest news, construction status, fare chart and system specifications of Kochi Metro.

  4. Phase-II of Kochi Metro Rail project will connect Ernakulam to Infopark and SmartCity via Kakkanad, covering 11 stations and 11.2 km. The project has received approval, funding and consultancy, and is expected to be completed by 2023.

  5. View the map of Kochi Metro, a metro system serving the city of Kochi, India. The system has one line and 21 stations, from Aluva to Thykoodam.

  6. Kochi Metro - Phase 1 Route Map. This is a list of stations of the Kochi Metro. There are 25 stations on the line from Aluva to Tripunithura railway station.

  1. People also search for