Search results
Keeping the restructuring of the power sector in mind, the government of Uttar Pradesh has enacted the U. P. Electricity Reform Act 1999 and has set up the U. P. Electricity Regulatory Commission (UPERC), as an autonomous body corporate.
The creation of Uttar Pradesh Power Corporation Ltd. (UPPCL) on January 14, 2000 is the result of power sector reforms and restructuring in UP (India) which is the focal point of the Power Sector, responsible for planning and managing the sector through its transmission, distribution and supply of electricity.
61. Uttar Pradesh Electricity Regulatory Commission (Grant of Connectivity to intra-State Transmission System) Regulations, 2010 (Notification dated 28-10-2010) 62. Uttar Pradesh Electricity Regulatory Commission (Promotion of Green Energy through Renewable Purchase Obligation) Regulations,2010 (Notified) 63.
These Regulations shall be called the UPERC (Rooftop Solar PV Grid Interactive Systems Gross / Net Metering) Regulations, 2019, (hereinafter referred to as RSPV Regulations, 2019.
1. Short Title and commencement: i. These Regulations shall be called the UPERC (Captive and Renewable Energy Generating Plants) Regulations, 2019 (hereinafter referred to as CRE Regulations, 2019). ii.
UPERC has mandated that power companies provide detailed instructions on how consumers can claim compensation for service disruptions or accidents, including web links, on the back of electricity...
provided in the UPERC (Electricity Supply Code) Regulations, 2005 and subsequent amendments thereof or as determined by the Commission from time to time.
1. Short Title and Commencement. 1.1 These regulations may be called the Uttar Pradesh Electricity Regulatory Commission (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. 1.2 These regulations shall come into force from the date of their publication in the Official Gazette.
UPERC Open Access Regulations. For large scale stand-alone solar projects set up for sale of power to Electricity distribution Company or Third party or Captive use, there shall be 100 % exemption from State cross subsidy surcharge for Interstate sale of solar power. 11.
2. State Discoms Tariff Order with Corrigendum for True-up for FY 2022-23, APR for 2023-24 and ARR and Tariff for FY 2024-25 in Petition no 2040/2023, 2041/2023, 2042/2023, 2043/2023 and 2048/2023. UPPCLOrderwithCorrigendum-pdf1017202471822PM.pdf.