Yahoo India Web Search

Search results

  1. TUNGABHADRA RIVER The river Tungabhadra derives its name from two streams viz., the Tunga, about 147 km (91.6 miles) long and the Bhadra, about 178 Km (110.9 miles) long which rise in the Western Ghats. The river after the influence of the two streams near Shimoga, runs for about 531 Km (330 miles) till it joins the river Krishna at ...

  2. tbboard.gov.in › daily › daily_level_listDaily Level - TBBOARD

    Tungabhadra Reservoir Water Level Information; Detailed Updated Information as on: 12-11-2024 - Search Past Info On This Day Last Year 10 Year AVG Max. Capcity* Reservoir Level

  3. Jul 11, 2024 · Tungabhadra Reservoir Water Level Information; Detailed Updated Information as on: 11-07-2024 - Search Past Info On This Day Last Year 10 Year AVG Max. Capcity* Reservoir Level

  4. TUNGABHADRA RIVER The river Tungabhadra derives its name from two streams viz., the Tunga, about 147 km (91.6 miles) long and the Bhadra, about 178 Km (110.9 miles) long which rise in the Western Ghats. The river after the influence of the two streams near Shimoga, runs for about 531 Km (330 miles) till it joins the river Krishna at ...

  5. Jun 23, 2016 · The full reservoir level (FRL) was fixed at RL 1633 ft. Capacity of the Reservoir at various levels was worked out based on the regular contour survey conducted in the river basin upstream of the Dam prior to the impounding of water in the reservoir.

  6. Samples of drinking water from T.B.Dam and Hampi colones are collected regularly and sent to Public Health Institute, Bangalore for conducting bacteriological and chemical analysis. On the basis of the results received, necessary action is being taken for ratifying the deficiencies in quality of drinking water, if any, from time to time.

  7. The main functions of the Tungabhadra Board are the Regulation of supplies of water to the Member States in accordance to KWDT award, Maintenance of the Dam and Reservoir viz., right portion of the Dam (0 to 3069.67 ft) and 33 spillway gates including safety aspects of the Dam and spillway, Maintenance of Right Bank High-Level Canal, Power ...

  8. Jun 22, 2016 · Tungabhadra Dam , Karnataka. June 22, 2016 tbboard. The River Tungabhadra derives its name from two streams viz., the Tunga, about 147 km (91.6 miles) long and the Bhadra, about 178 Km (110.9 miles) long which rise in the Western Ghats.

  9. YEARWISE UTILISTION OF WATER. The Krishna water Disputes Tribunal (KWDT) has allocated 212 TM cft of water for Tungabhadra Project for irrigation utilization excluding reservoir evaporation losses.

  10. The balance of the works namely the spillway, bridge road on the top of the dam, construction of utility tower, manufacture of crest grates for storing water upto 1633 level were completed in all respects by the end of June 1958.