Search results
1. As published in Gazette of India, Pt. II (3), dt. 26.6.1956. CHAPTER I PRELIMINARY 1. Short title and commencement- (1) These rules may be called the Indian Electricity Rules, 1956. (2) They shall come into force at once. 2. Definitions- (1) In these rules, unless the context otherwise requires, -
- 501KB
- 191
- 4. OBJECTIVE:
- 5. SCOPE and APPLICABILITY:
- 6. NODAL AGENCY:
- 7.1 Role of Central Electricity Authority (CEA)
- 7.2 Role of CTU
- 7.3 Role of National Power Committee (NPC) and Regional Power Committee (RPC):
- 7.5 Role of RLDCs:
- 7.6 Role of SLDCs:
- 7.7 Role of STUs
- 7.8 Role of Users:
- 8.1 ISTS Communication system
- 8.2 Intra-State Communication System:
- 9. PERIODIC TESTING OF THE COMMUNICATION SYSTEM:
- 10. Periodic Auditing of Communication System:
- 11. FAULT REPORTING:
- 13. Cyber Security:
- 16. Power to Relax:
- 17. Power to Remove Difficulty:
These regulations provide for planning, implementation, operation and maintenance and up-gradation of reliable communication system for all communication requirements including exchange of data for integrated operation of National Grid.
(i) These regulations shall apply to the communication infrastructure to be used for data communication and tele -protection for the power system at National, Regional and inter-State level and shall also include the power system at the State level till appropriate regulation on Communication is framed by the respective State Elec...
The nodal agency for planning, and coordination for development of communication system for inter-State transmission system user shall be the Central Transmission Utility. The nodal agency for planning, and coordination for development of communication system for intra - State transmission system user shall be the State Transmissi...
CEA shall formulate communication planning criterion and guidelines for development of reliable communication system for power system of India duly considering requisite route redundancy ,capacity, as well as requirements of smart grid and cyber security. CEA shall formulate and notify technical standards, cyber security requi...
(i) The CTU shall in due consideration of the planning criteria and guidelines formulated by CEA, be responsible for planning and coordination for development of reliable National communication backbone Communication System among National Load despatch Centre, Regional Load Despatch Centre(s) and State Load Despatch Ce...
NPC shall be responsible for issuance of the guidelines with the approval of the Commission on “Availability of Communication System” in consultation with RPCs, RLDCs, CTU, CEA and other stakeholders within a period of two months from the date of notification of these regulations. The RPC Secretariat shall certify the availability of communicatio...
The Regional Load Despatch Centre shall be nodal agency for integration and supervision of Communication System of the ISTS, ISGS, SLDCs and IPPs at RLDC end for monitoring, supervision and control of Power System and adequate data availability in real time. The Regional Load Despatch Centre (RLDC) shall collect and furnish data related to Communi...
The State Load Despatch Centres shall be nodal agency for integration of Communication System in the intra-State network, distribution system and generating stations at SLDC end for monitoring, supervision and control of Power System and adequate data availability in real time. SLDC shall provide operational feedback to CTU and STU.
The STU shall be responsible for planning, coordination and development of reliable communication system for data communication within a State including appropriate protection path among State Load Despatch Centre, Area LDC, Sub-LDC and DISCOM LDC including Main and backup as applicable along with STU Sub-Stations, intra-State ...
The Users including renewable energy generators shall be responsible for provision of compatible equipment along with appropriate interface for un-interrupted communication with the concerned control centres and shall be responsible for successful integration with the communication system provided by CTU or STU for ...
NLDC RLDCs SLDCs (ISTS interconnection) ISTS sub-stations of transmission licensee ISGS, Central Generating Stations, Solar generation plants/ solar parks and wind generation pooling stations connected to ISTS as required.
SLDC ( State Inter-connection) STU Distribution Companies State Generating Stations including renewable generators connected to State network. (v) Sub-stations of STU and State Transmission licensees
All users that have provided the communication systems shall facilitate for periodic testing of the communication system in accordance with procedure for maintenance and testing to be prepared by CTU within 60 days of notification of Regulations and approved by Commission. Testing process for communication network security should a...
The RPC Secretariat shall conduct performance audit of communication system annually as per the procedure finalised in the forum of the concerned RPC. Based on the audit report. RPC Secretariat shall issue necessary instructions to all stakeholders to comply with the audit requirements within the time stipulated by the RPC Secretariat. An Annual R...
RLDC and SLDC in case of outage of telemeter data, or communication failure shall inform the respective user so that the user shall ensure healthiness of its communication system. In case outage pertains to fault in communication system of other user, the user shall lodge complaints for failure of the communication to the communication sy...
Communication infrastructure shall be planned, designed and executed to address the network security needs as per standard specified by CEA and shall be in conformity with the Cyber Security Policy of the Govt. of India, issued from time to time. NLDC, shall monitor case of cyber security incidences and discuss them at RPC level and take necessar...
The Commission may by general or special order, for reasons to be recorded in writing, and after giving an opportunity of hearing to the parties likely to be affected by grant of relaxation, may relax any of the provisions of these regulations on its own motion or on an application made before it by an ...
If any difficulty arises in giving effect to the provisions of these regulations, the Commission may, by order, make such provision not inconsistent with the provisions of the Act or provisions of other regulations specified by the Commission, as may appear to be necessary for removing the difficulty in giving eff...
- 515KB
- 11
Oct 29, 2024 · No BEE/S & L/AC/37/2017-18 dated 29.11.2017 BEE (Particulars & Manner of their display on Labels of Room Air Conditioner) Regulations, 2017 View or Download Document ( Size: 2.3 MB, Format: PDF, Language: English)
These Regulations may be called “Delhi Electricity Regulatory Commission (Supply Regulations, 2017”. Code. and. Performance. Standards) (2) These Regulations shall be applicable to all the Distribution Licensees including Deemed Licensees and all consumers in the National Capital Territory of Delhi.
(1) These regulations shall be called the Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fifth Amendment) Regulations, 2017. (2) These regulations shall come into force with effect from 1st May, 2017. 2. Amendment of Regulation 2 in General Part of Principal Regulations
- 85KB
- 8
Jan 8, 1999 · Procedures/Guidelines on under the Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017. 1. Guidelines Availability of Communication System (Order - date 19.01.2024)
People also ask
Which Regulatory Commission (Indian Electricity Grid Code) Regulations 2015?
What are the regulations relating to electricity grid disturbance in India?
What are Delhi Electricity Regulatory Commission (Supply Regulations) 2017?
What is the First Amendment of Central Electricity Regulatory Commission regulations 2022?
What are the procedures/guidelines under Central Electricity Regulatory Commission (communication system) regulations?
When will real-time electricity market be implemented in India?
section (2) of section 176 of the Electricity Act, 2003 (Act 36 of 2003), the Central Government hereby makes the following rules, namely:- 1. Short title and commencement.- (1) These rules may be called the Electricity (Rights of Consumers) Rules, 2020.