  1. Line 3 (Aqua Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. [5] [6] When completed, the 33.5 km (20.8 mi) long line will be the first underground metro line in Mumbai, [7] with 27 underground stations and one at-grade station. [8]

  2. 3 days ago · Mumbai Metro Line 3 Details and Operation Timings The Metro Line 3 project covers a total corridor length of 33.5 kilometers, with a completion date expected by March 2025. Once fully operational, the line will have a total of 27 stations and will serve commuters with operational hours from 6:30 AM to 10:30 PM on weekdays and 8:30 AM to 10:30 PM on weekends.

  3. 4 days ago · The decision to construct Metro Line 3 underground was driven by Mumbai’s unique urban landscape and space constraints. “Globally, core city areas are often connected by underground Metros to avoid disturbing ground-level activities,” Bhide explained.

    • Information
    • Key Figures
    • System Specifications
    • Line-3’S Route Information
    • Line-3’S Status
    • Fares
    • Tenders
    • Line-3’S Contractors
    • GeneratedCaptionsTabForHeroSec

    Mumbai Metro’s Line-3 (Aqua Line) is a 33.5 km under construction metro line with 27 stations connecting Cuffe Parade – BKC – Aarey Colony. Mumbai Metro Rail Corporation Limited (MMRC) is the nodal agency responsible for building this primarily-underground line, and was constituted as a JV of the Govt. of India (GOI) and the Government of Maharasht...

    Estimated Cost: Rs. 23,136 crore
    Estimated Daily Ridership: 17.0 Lakhs/Day (2021)
    Under Construction: 33 km
    On Hold: 0.5 km (Ramp – Aarey Colony Station)
    PHPDT: 39,000 (2021)
    Rolling Stock Width & Axle Load: 3.2m & 17T
    Top Speed: 90 kmph
    Average Speed: 34 kmph

    Line-3 – Aqua Line: Cuffe Parade – BKC – SEEPZ – Aarey Colony 1. Length: 33.5 km 2. Type: Underground & At-Grade 3. Depot: Aarey Colony (tentative; possibly Kanjurmarg pending court’s decision) 4. Number of Stations: 27 5. Station Names: Cuffe Parade, Vidhan Bhavan, Churchgate, Hutatma Chowk, CSMT, Kalbadevi, Girgaon, Grant Road, Mumbai Central, Ma...

    As of December 2022, tunneling progress stands at 100% completion with all 42 TBM breakthroughs completed. Tunneling works on all 7 underground civil packages have been wrapped up: 1. Package UGC-01: Cuffe Parade – CST (4.25 km) – Final breakthrough recorded by TBM Surya-1in May 2021 2. Package UGC-02: CST – Mumbai Central (4.049 km) – Final breakt...

    Line-3’s fare structure, prices and rules have not been announced yet. MMRCL plans to deploy an open loop automatic fare collection (AFC) system. Users will be able to pay using QR codes on their phones, contactless pre-paid and post-paid smart cards.

    Latest notices inviting tenders can be viewed on MMRCL’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & construction page.

    Click on ‘News & Construction Updates’ below for project news, progress and updates. Menu: News & Construction Updates | Overview | Yellow Line | Red Line | Aqua Line | Green Line | Orange Line | Pink Line Page last updated: December 27, 2023. Have a question or spot an error? Let me know here.

    Mumbai Metro Line 3 (Aqua Line) is a 33.5 km underground and at-grade metro line with 27 stations connecting Cuffe Parade – BKC – Aarey Colony. The line is expected to open in stages from January 2024, with a cost of Rs. 23,136 crore and a daily ridership of 17 lakhs.

  4. Aug 30, 2024 · Mumbai Metro Line 3 (Colaba-Bandra-Seepz) metro corridor is a 33.5 KM long line consist of 27 stations where 26 stations will be underground and 1 station at grade. This line will be the first fully underground metro line in Mumbai connecting Cuffe Parade from the south end of the city to Kanjumarg in the north.

  5. 3 days ago · Mumbai Metro Aqua Line: The first phase spans 12.44 km with 10 stations, operating from 6:30 AM to 10:30 PM, providing 96 daily trips. Written by FE Online September 25, 2024 11:02 IST

  6. 3 days ago · Mumbai Metro Line 3 (Aqua) is Mumbai’s first fully underground metro line. It covers a total length of about 33.5 km, featuring 26 underground stations and 1 at-grade station. Initially, the commercial operations will likely commence on the 4th of October from Aarey Colony to BKC. This stretch is 12.5 km long and has ten stations. Mumbai ...