Yahoo India Web Search

Search results

  1. BESCOM | SRTPV Online Application. Government of Karnataka has notified Karnataka Renewable Energy Policy 2022-27 on 30.04.2022. In order to tap the existing solar energy opportunities & other sources of Renewable generation in the State, Policy allows Grid connected Rooftop solar PV projects under Net Metering and Gross Metering arrangement.

  2. Apply for a new Solar Rooftop Connection. Enter your Account ID/Consumer ID to proceed.

  3. Apply for a new Solar Rooftop Connection under MNRE National Portal for Solar Rooftop (NAPS) Scheme. Enter Your NAPS Registered Reference Code to Proceed: Note:- Please enter complete Registration Reference Code Eg.

  4. Apply for a new Solar Rooftop Connection (for govt. buildings under 13th finance commission) Enter your Account ID/Consumer ID to proceed. I have read and accept to the Terms & Conditions and abide by tariff & other terms and conditions determined by the Hon'ble KERC for FY-21-22.

  5. Track Your Application. Enter Application Number. Enter Registered Mobile Number. @ 2020 - Design By BESCOM. 080 2234 0816 solar_helpdesk@bescom.co.in.

  6. Guidelines for Grid connectivity of Solar Rooftop Photo Voltaic (SRTPV) systems installed as per the KERC (Implementation of Solar Rooftop Photovoltaic Power plants) Regulations, 2016: The SRTPV Application is invited from all the consumers of BESCOM through. On-line mode only and no off-line Applications are allowed.

  7. 20% payment after installation of structure. 20% payment after installation of SPV modules and inverters at site. 20% payment after completing plant installation (including net-metering) and submission of written inspection request to the implementing agency. Final 20% payment after commissioning of the plant and injection of power to the grid.

  8. Manual for Online SRTPV application for capacity 1 to 10kW for BESCOM Consumers 1. Log on to BESCOM website https://bescom.karnataka.gov.in/ 2. Click on-> Rooftop Solar – non subsidy or Subsidy

  9. srtpv.bescom.org › SRTPV › application_tracker_feasibilitySRTPV Online Application - BESCOM

    425.0. Remarks. TECHNICALLY FEASIBLE. Download PPA Intimation Letter. Download Draft PPA - Gross metering. Download Draft PPA - Net metering. @ 2020 - Design By BESCOM. 080 2234 0816 solar_helpdesk@bescom.co.in.

  10. Apply for a new Solar Rooftop Connection (for govt. Smart City Application) Enter your Account ID/Consumer ID to proceed.