  1. Project Route. MML-3 is a 33.5 KMs long underground corridor running along Colaba-Bandra-SEEPZ. Length of the corridor is marked with 27 key stations out of which 26 will be underground and 1 at grade. The details of the stations are:

  2. Mumbai Metro Rail Corporation Limited (MMRCL) is the nodal agency responsible for the implementation of Mumbai Metro Line–3 (MML-3) project. It has been constituted as a JV (Joint Venture) of the Govt. of India (GOI) and the Government of Maharashtra (GOM) on 50:50 sharing basis.

  3. The Mumbai Metro Line 3 Project is divided into 18 main packages of ‘Project’ & ‘System’ wings. You can check here package wise status of the project.

    • Information
    • Key Figures
    • System Specifications
    • Line-3’S Route Information
    • Line-3’S Status
    • Fares
    • Tenders
    • Line-3’S Contractors

    Mumbai Metro’s Line-3 (Aqua Line) is a 33.5 km under construction metro line with 27 stations connecting Cuffe Parade – BKC – Aarey Colony. Mumbai Metro Rail Corporation Limited (MMRC) is the nodal agency responsible for building this primarily-underground line, and was constituted as a JV of the Govt. of India (GOI) and the Government of Maharasht...

    Estimated Cost: Rs. 23,136 crore
    Estimated Daily Ridership: 17.0 Lakhs/Day (2021)
    Under Construction: 33 km
    On Hold: 0.5 km (Ramp – Aarey Colony Station)
    PHPDT: 39,000 (2021)
    Rolling Stock Width & Axle Load: 3.2m & 17T
    Top Speed: 90 kmph
    Average Speed: 34 kmph

    Line-3 – Aqua Line: Cuffe Parade – BKC – SEEPZ – Aarey Colony 1. Length: 33.5 km 2. Type: Underground & At-Grade 3. Depot: Aarey Colony (tentative; possibly Kanjurmarg pending court’s decision) 4. Number of Stations: 27 5. Station Names: Cuffe Parade, Vidhan Bhavan, Churchgate, Hutatma Chowk, CSMT, Kalbadevi, Girgaon, Grant Road, Mumbai Central, Ma...

    As of December 2022, tunneling progress stands at 100% completion with all 42 TBM breakthroughs completed. Tunneling works on all 7 underground civil packages have been wrapped up: 1. Package UGC-01: Cuffe Parade – CST (4.25 km) – Final breakthrough recorded by TBM Surya-1in May 2021 2. Package UGC-02: CST – Mumbai Central (4.049 km) – Final breakt...

    Line-3’s fare structure, prices and rules have not been announced yet. MMRCL plans to deploy an open loop automatic fare collection (AFC) system. Users will be able to pay using QR codes on their phones, contactless pre-paid and post-paid smart cards.

    Latest notices inviting tenders can be viewed on MMRCL’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & construction page.

    Click on ‘News & Construction Updates’ below for project news, progress and updates. Menu: News & Construction Updates | Overview | Yellow Line | Red Line | Aqua Line | Green Line | Orange Line | Pink Line Page last updated: December 27, 2023. Have a question or spot an error? Let me know here.

  4. The project is being implemented, and will be operated, by the Mumbai Metro Rail Corporation Limited (MMRCL). The total cost of this line is estimated at ₹30,000 crore (US$3.6 billion).

  5. May 15, 2023 · MUMBAI: One of the ambitious and challenging infrastructure undertakings in Mumbai, Aqua Line 3, a 33.5 KM underground metro route connecting North and South Mumbai, is expected to be completed by June 2024.

  6. Mumbai Metro Rail Corporation Limited (MMRCL) is the nodal agency responsible for the implementation of Mumbai Metro Line–3 (MML-3) project. It has been constituted as a JV (Joint Venture) of the Govt. of India (GOI) and the Government of Maharashtra (GOM) on 50:50 sharing basis.