Yahoo India Web Search

Search results

  1. Bokaro Steel is working towards becoming a one-stop-shop for world-class flat steel in India. The modernisation plans are aimed at increasing the liquid steel production capacity, coupled with fresh rolling and coating facilities.

  2. Bokaro Steel Plant ( BSL) is located in the Bokaro district of Jharkhand. It is the fourth integrated public sector steel plant in India built with Soviet technology.It is the second largest steel plant in India after Bhilai Steel Plant and 3rd largest in Asia in-terms of area (10 km x 5 km).

  3. Jun 14, 2024 · eProcurement @ Bokaro Steel Plant. Ground Booking. Booking of open fields under TA. Voter Card Upload. For On-roll Employees of BSL, SAIL. Recent Events (from the desk of PRO) World Environment Day Program in Bokaro Club (Event Date: 2024-06-05) World Environment Day Program in Bokaro Club (Event Date: 2024-06-05) Closing Ceremony of Annual Summer Coaching Camp 2024 (Event Date: 2024-06-03)

  4. The Bokaro Steel Plant was established with the collaboration of Soviet Union when the First Prime Minister Jawahar Lal Nehru desired to establish a steel plant in the region. Bokaro Steel Plant expansion to extend its capacity from 4.5 million metric tons to 7.5 million metric tonnes in 2010-2011. Vedanta Electrosteel Castings Limited - A ...

  5. sail.co.in › en › plantsFacilities | SAIL

    Bokaro Steel Plant has 5 Blast Furnaces, four with 2000-cubic metre useful volume and one with 2500 cubic metre useful volume that produce molten iron - Hot Metal - for steel making. Total Hot metal production capacity of Blast furnaces is 5.25 MT.

  6. Apr 1, 2024 · Bokaro Steel Plant (BSL) has reported a significant surge in major product outputs in the financial year 2023-24 compared to the previous fiscal year.

  7. May 2, 2022 · Bokaro Steel Plant was conceptualized in 1965 with the assistance of the Union of Soviet Socialist Republics (USSR) and started its operation in 1972. Proximity to iron ore and coal blocks had made the place a favorable site for the steel plant.

  8. Apr 14, 2023 · In SAIL's 50-year history, Bokaro Steel Plant has set records in every field during the last financial year 2022 - 23 and has achieved the highest ever production of all products.

  9. Mar 28, 2022 · The process adopted by SAIL's Bokaro Steel Plant for sale of secondary steel products is through Online Forward Auction (OLFA) conducted by Mjunction Services Limited. This information was given by Union Minister of Steel Shri Ram Chandra Prasad Singh in a written reply in the Rajya Sabha today.

  10. steel.gov.in › sites › defaultBOKARO STEEL PLANT

    steel in Bokaro Steel Plant (BSL). The annual installed capacity for Crude Steel of Bokaro Steel Plant at present is 4.36 Million Tonnes. The total land utilised at present is 17751.275 acres out of the total land of 31287.24 acres. (c) No such proposal exists at present. (d) The acquisition of land at Bokaro has been done under the 1956 and1964

  1. People also search for