  1. What is cast in situ concrete pile? Bored cast in situ pile is constructed by digging a hole in the ground by suitable means such as percussive or rotary method with the use of temporary or permanent casing or drilling mud. ...

  2. The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated risks involved, develop and implement adequate control measures and to ...

  3. Feb 15, 2014 · The construction of bore cast in situ concrete pile consists of 4 primary phases. 1.Pile boring, 2.Reinforcement cage lowering, 3.Flushing. 4.Pile concreting. Now we will discuss each phase one by one. Pile installation process. 1. Pile Boring. Hydraulic rig/manually operable auger should be mobilized at the required location.

  4. Sep 16, 2016 · This document provides an overview of a seminar on bored cast-in-situ piles. It discusses pile classification, general construction descriptions, workmanship requirements, load testing procedures, equipment used, and testing methods for concrete and aggregates.

  5. Cast-in-situ pile is a type of pile which is entirely constructed on a project site. The construction process includes drilling the borehole, fabrication and placement of reinforcement cages, and placement of concrete. Certain steps of pile construction can be carried out at the same time.

  6. Pile foundations pr vide an effective means of transmitting large concentrated loads hrough overburden soils to underlying rock or socketed into rock. Bored cast-in-situ piles has he advantages of increasing theload

  7. Bored piles are steel reinforced concrete elements cast in situ used to transfer high loads through soil to deeper, more competent soil or rock stratum. Constructed with conventional rotary kelly bar plant, the drilling tooling is selected to suit the nature of the soils to be excavated.

  8. Driven cast in-situ concrete piles are constructed by driving a closed-ended hollow steel or concrete casing into the ground and then filling it with concrete. The casing may be left in position to form part of the pile, or withdrawn for reuse as the concrete is placed.

  9. Under reamed piles, also known as bored cast-in-situ piles, are a type of deep foundation used in construction projects to support heavy loads. These piles are created by drilling a hole into the ground and filling it with concrete while simultaneously expanding the bottom section of the hole to form an enlarged bulb-like shape.

  10. www.kellerindia.com › expertise › techniquesBored piles | Keller India

    Bored piles are a very effective, state-of-the-art construction element with many applications in foundation and civil engineering.