Yahoo India Web Search

Search results

  1. Mumbai Metro’s Line-3 will open in 2 stages (Aarey Colony – BKC and BKC – Cuffe Parade). The first section is expected to be completed and opened in January 2024, much later than its deadline of June 2021.

  2. Aug 28, 2023 · Mumbai Metro Line 3 (Colaba-Bandra-Seepz) metro corridor is a 33.5 KM long line consist of 27 stations where 26 stations will be underground and 1 station at grade. This line will be the first fully underground metro line in Mumbai connecting Cuffe Parade from the south end of the city to Kanjumarg in the north.

  3. Line 3 (Aqua Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. [5] [6] When completed, the 33.5 km (20.8 mi) long line will be the first underground metro line in Mumbai, [7] with 27 underground stations and one at-grade station. [8]

  4. Jun 24, 2024 · The latest addition to the fast-growing metro network is the Mumbai Metro Line 3. It is also known as the Mumbai Metro Aqua Line or the Colaba-Bandra-SEEPZ Line. The Metro Line 3 will be 33.5km long once ready and will have 27 stations starting from Cuffe Parade to Aarey Colony.

  5. Jun 27, 2024 · Mumbai Metro Line 3 is also known as the Aqua Line. Check out details, such as its route, stations, etc., in this guide.

  6. Jun 29, 2024 · Mumbai Metro Line 3 Completion Date: The highly-awaited Aqua Line of the Mumbai Metro project is set to be completed soon. In a cheer for Mumbaikars, the metro line is learnt to start as soon as this year only. Mumbai Metro 3’s first phase will run between SEEPZ (Santacruz Electronics Export Processing Zone) and Bandra Kurla Complex.

  7. Mumbai Metro Line - 3 (MML - 3) is one of such key projects to improve the transportation scenario in the financial capital of India

  8. Project Route. MML-3 is a 33.5 KMs long underground corridor running along Colaba-Bandra-SEEPZ. Length of the corridor is marked with 27 key stations out of which 26 will be underground and 1 at grade. The details of the stations are:

  9. Centers of Employment. Airports. Educational Institutes. Interchange points. Areas not served by Suburban rail

  10. 6 days ago · Mumbai Metro Line 3 Map MML-3 is a 33.5 kilometer long underground corridor running along Colaba-Bandra-SEEPZ. Length of the corridor is marked with 27 key stations out of which 26 will be underground and 1 at grade. The route will include Centres of Employment like Nariman Point, Cuffe Parade, Mumbai, Fort Mumbai, Worli / Lower Parel, Seepz, Mumbai, Maharashtra, Bandra Kurla Complex, Kalbadevi.