Yahoo India Web Search

Search results

  1. Line 3 (Aqua Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. When completed, the 33.5 km (20.8 mi) long line will be the first underground metro line in Mumbai, with 27 underground stations and one at-grade station.

  2. The Mumbai Metro Line 3 will run over a distance of 33.5 km from Aarey colony to Cuffe Parade, covering 27 stops. "Running a 33.5 km route from Aarey Colony to Cuffe Parade with 27 stops, it will ...

  3. Mumbai Metro Line - 3 (MML - 3) is a fully underground 33.5Km. long corridor running along Colaba-Bandra-SEEPZ, envisaged to give respite from traffic to Mumbaikars and improve the transportation scenario in the financial capital city of India i.e., Mumbai.

  4. Mumbai Metro’s Line-3 (Aqua Line) is a 33.5 km under construction metro line with 27 stations connecting Cuffe Parade – BKC – Aarey Colony.

  5. MML-3 is a 33.5 KMs long underground corridor running along Colaba-Bandra-SEEPZ. Length of the corridor is marked with 27 key stations out of which 26 will be underground and 1 at grade. The details of the stations are:

  6. Aug 28, 2023 · Mumbai Metro Line 3 (Colaba-Bandra-Seepz) metro corridor is a 33.5 KM long line consist of 27 stations where 26 stations will be underground and 1 station at grade. This line will be the first fully underground metro line in Mumbai connecting Cuffe Parade from the south end of the city to Kanjumarg in the north.

  7. 6 days ago · Mumbai’s first underground Metro rail corridor is all set to commence operations from July 24. The announcement for the opening of the corridor, also known as Mumbai Metro Line 3, was made by ...

  8. 6 days ago · Mumbai Metro Line 3 Update According to the Mumbai Metro Rail Corporation's website, almost all civil works, around 99.2 per cent, have been finished. Station construction is nearly complete at 97 ...

  9. 6 days ago · Mumbai Metro Line 3, also known as Mumbai Metro Aqua Line or Colaba-Bandra-SEEPZ Line, is a 33.5 km underground route that will connect south Mumbai to the city’s western suburbs and is expected to reduce the burden on the suburban locals. “Mumbai’s first underground metro (Aqua Line) is starting from July 24, which will give new impetus ...

  10. Jul 7, 2024 · Mumbai Metro Rail Corporation (MMRC) on Thursday extended trial runs (train testing) on Mumbai Metro’s 33.5 km Line-3 (Aqua Line) from Dadar Station up to Siddhivinayak Station. MMRC and Alstom Transport’s teams manually operated one of their 8 coach Alstom Metropolis trains at a low-speed of 10 kmph on the down-line tracks up to Siddhi ...

  1. Searches related to mumbai metro line 3

    mumbai metro line 3 map