Yahoo India Web Search

Search results

  1. Dictionary
    upset

    verb

    noun

    adjective

    More definitions, origin and scrabble points

  2. Feb 12, 2004 · RDK (Civil/Environmental) 16 Feb 04 09:53. Local usage may vary slightly but around here it is the maximum that the client will pay in any circumstance. Lets say that you have an upset limit of $10,000. You do the work on hourly rates and the total comes in at $8,000. You bill and are paid $8,000.

  3. Sep 29, 2008 · A typical stress limit is 1.2S H. Service Level C is an upset condition where the piping may have large deformations and require repair. It generally includes analysis for internal pressure, deadweight, and a safe shutdown earthquake. In some cases, it will also include transient loads. A typical stress limit is 1.8S H.

  4. Mar 9, 2010 · RE: How do we define "sound engineering practice" rneill (Mechanical) 9 Mar 10 12:16 As mentioned by others, consider whether you could stand up in a courtroom and reasonably defend what you did as reasonable and prudent and consistent with established industry practice (as documented in established Codes and Standards, and typical industry specifications).

  5. ARC CRACKS Definition: A depression left at the termination of the weld where the weld pool is left unfilled. ...

  6. May 7, 2007 · thread794-186287. I have been trying to find if there is a similar rule for Section VIII-1 pressure vessels to allow temporary increases in pressure and temperature avove the design conditions as is allowed in B31.3 for process piping. I don't know if that would be considered as "abnormal pressures" under UG-22 (i), where you can use a higher ...

  7. Oct 24, 2005 · One trick I have used is to define a 1206 resistor which had a short circuit built into the copper layout. I suspect the pads were not directly shorted but had a 0.02 thou gap which would prevent the software getting upset but would still work correctly! This way you can define the routing to give nice star points in ground paths.

  8. Jul 26, 2022 · Define your maximum operating temperature for the shell side, which should include any upstream process upset that may increase the temperature above your normal operating temperature of 57C. Then, add say 10C to that and round it up to the nearest 5C increment.

  9. Nov 17, 2009 · 2) The minimum temperature as estimated by the process engineer, including upsets. 3) If the vessel or pipe is filled with a pressurized liquid, the boiling point of the liquid at atmospheric. pressure. For example liquid ammonia has a boiling point of –33°C [–28°F] and propane has a boiling point of –40°C [–40°F].

  10. May 14, 2007 · Team Members www.pip.org VEDBI003 - Vessels for Bulk Solids Data Sheet This Practice is the data sheet required to define options covered in PIP VESBI002, Design and Specification of Vessels for Bulk Solids, and other specific requirements applicable to the particular vessel under consideration for service (startup, normal operation, upset, shutdown), location, maintenance, etc.

  11. Nov 11, 2009 · Recommended for you. Rated suction pressure would be the suction pressure needed when the pump is discharging its rated flow. Maximum suction pressure is the rating of the pump's suction flange, or possibly some other factor which limits suction pressure to the given maximum value. Rated suction pressure would be the suction pressure at normal ...