Yahoo India Web Search

Search results

  1. SET OF CEILING PANEL FOR LHB POWER CAR. Roof Sheeting Complete for AC-2 Tier Coaches (CRF) One Coach Set of Air Spring Assembly (140 KN Capacity) for Main Line/Rajdhani LHB coaches for FIAT type Bogies. SET OF DOOR CUTOUT COMPLETE FOR POWER CAR LHB COACHES. SET OF TROUGH FLOOR PARTS (CRF).

  2. Modern Coach Factory, Raebareli (formerly Rail Coach Factory, Raebareli) or MCF Raebareli is a rail coach manufacturing unit of the Indian Railways at Lalganj near Raebareli in Uttar Pradesh.

  3. In 2007, Indian Railways decided to set up it’s third railway passenger coaches manufacturing unit in Lalganj, distt Raebareli in Uttar Pradesh. Foundation stone was laid in 2007 and construction work started in 2009. In Dec 2015, it was named as Modern Coach Factory.

  4. Modern Coach Factory, Raebareli, Raebareli. 1,864 likes · 59 talking about this · 281 were here. This is an official page of Modern Coach Factory, Raebareli. It is India's 3rd coach manufacturing...

  5. The Prime Minister, Shri Narendra Modi has applauded the new record of manufacturing 10,000 coaches since its inception by Modern Rail Coach Factory, Raebareli in April 2023. Sharing a tweet by Ministry of Railways, the Prime Minister said;

  6. May 8, 2023 · Modern Coach Factory in Rae Bareli, India has achieved a remarkable milestone by manufacturing 10,000 coaches since its inception in 2012, an accomplishment lauded by Prime Minister Narendra Modi.

  7. In Dec 2015, it was named as Modern Coach Factory. It was planned at a total cost of Rs 3,192 Crore, with annual production capacity of 1000 coaches. MCF is located around 3 km away from Lalganj on Kanpur-Raebareli road (85 km from Lucknow).

  8. The Modern Coach Factory (MCF), in Rae Bareli, planned a water conservation strategy and developed 100 million litres water conservation capacity in 2023-24, as part of Jal Shakti Abhiyan, a...

  9. May 5, 2023 · The Prime Minister, Shri Narendra Modi has applauded the new record of manufacturing 10,000 coaches since its inception by Modern Rail Coach Factory, Raebareli in April 2023. Sharing a tweet by Ministry of Railways, the Prime Minister said;

  10. MCF will become 1st Rail factory to meet Zero-Energy Mega Factory standards by 2020-21. Solar energy capacity will be raised from 3 MW to 10 MW which will help achieve ‘Energy Neutral’ standards for the unit and the township. MCF has boosted local economy of Raebareli.